Gjøa oilfield

Gjøa oilfield
Location of Gjøa oilfield
Country Norway
Region North Sea
Offshore/onshore offshore
Coordinates

61°19′56.51″N 3°53′48.55″E / 61.3323639°N 3.8968194°E / 61.3323639; 3.8968194Coordinates: 61°19′56.51″N 3°53′48.55″E / 61.3323639°N 3.8968194°E / 61.3323639; 3.8968194{{#coordinates:61|19|56.51|N|3|53|48.55|E|type:landmark |primary |name=

}}
Operators Statoil
GDF Suez
Partners Statoil
GDF Suez
Petoro
Royal Dutch Shell
RWE Dea
Field history
Discovery 1989
Start of development 2007
Start of production 2010
Production
Estimated oil in place 83 million barrels (~1.1×10^7 t)
Estimated gas in place Script error: No such module "convert".

Gjøa oilfield is an oilfield in the Norwegian section of the North Sea. It lies about Script error: No such module "convert". off the Troll field.

The Gjøa reserves are estimated to be about 40 billion cubic metres of natural gas and Script error: No such module "convert". of oil and condensate.[1]

The oil field was discovered in 1989 and the development was announced in December 2006. It is developed by the consortium of Statoil, GDF Suez, Petoro, Royal Dutch Shell and RWE Dea. During the development phase, the operator of the field is Statoil. When production begins GDF Suez will take over the operatorship. The field will become on stream in 2010, and it will reach plateau production in 2011. The total investment is about 27 billion Norwegian krones.[1]

Produced gas is transported through the FLAGS pipeline to the St Fergus Gas Terminal in Scotland. Gjøa is connected to the FLAGS pipeline through the Script error: No such module "convert". Script error: No such module "convert". link built by Saipem. The linking pipeline was laid by the Castoro Sei vessel. Oil is exported through the Script error: No such module "convert". Script error: No such module "convert". link to the Troll II trunkline, and onwards to the Mongstad Refinery north of Bergen.[2][3] The gas field came on stream in November 2010.[4]

Gjøa semi-submersible floating production platform is also linked with the Vega and Vega South fields development.[1][2]

Gjøa semi-submersible floating production platform was designed by Aker Solutions Engineering in 2006-2010.

References

  1. ^ a b c "Statoil kicks off Gjoa plan". Upstream Online (NHST Media Group). 2006-12-15. Retrieved 2010-03-14. 
  2. ^ a b "Gjøa export pipeline installation awarded". Offshore (PennWell Corporation). 2007-10-03. Retrieved 2010-03-14. 
  3. ^ "StatoilHydro picks Saipem for N.Sea pipeline jobs". Reuters. 2007-10-03. Retrieved 2010-04-10. 
  4. ^ "UK gas eases on high supply, Norway field start". Reuters. 2010-11-08. Archived from the original on 2010-11-09. 



Lua error in package.lua at line 80: module 'Module:Buffer' not found. Lua error in package.lua at line 80: module 'Module:Buffer' not found. Lua error in package.lua at line 80: module 'Module:Buffer' not found.